Construction began for this two-story, 15,000-square-foot office building with demolition to remove an existing building along with extensive asphalt and concrete debris. The construction of the new office building included brick exterior, metal siding, dimensional shingles and an arched curtain wall system at the main entrance. Interior finishes included slate flooring, vinyl wall coverings and a unique maple and steel handrail system at the second floor balcony.
TCF Headquarters
This three-story, 60,000-square-foot office building is located on an artfully landscaped five-acre