The Alan Group was awarded the construction contract for this three-story, 60,000-square foot, precast building in spring 2008. Working with two separate architectural firms, along with the owner and developer, The Alan Group was able to coordinate both the core and shell construction and the tenant build-out for a successful and impressive project. Interior finishes included a unique ornamental handrail system for the second floor balcony, rich oak paneling, extensive ceramic tiling, with stone and granite counters throughout. This project was turned over to the owner mid-summer 2009.

Completion Date: Summer 2009